Aenean convallis aliquet lacus vitae tempus. Suspendisse accumsan nisl sit amet justo auctor id accumsan purus malesuada. Sed gravida, erat ut commodo commodo, metus ante facilisis ante, a vulputate tortor velit gravida tortor. Vivamus ante ante, fringilla vel hendrerit at, interdum id tortor.
About: gergana
Recent Posts by gergana
Image format post
Donec dictum libero vel orci malesuada mattis. Suspendisse libero ante, varius ac laoreet vel, blandit eget lacus. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia Curae; Sed porta, arcu sit amet consequat fermentum, erat est ullamcorper tortor, sed eleifend urna dolor vitae sem.
Paladin was retained to look at trenchless options to install three 48-inch steel casings under highway 63 at Syncrude's base plant of operations north of Fort McMurray. Paladin provided design, construction execution, assist Graham Construction with bid tendering and construction management during installation. Ground conditions encountered were different than what were planned with chunks of shale being in size of up to 70% of the diameter of the casing making the proposed installation method not applicable anymore. In short turnaround a revised plan for proposed, risk assessments completed, additional equipment mobilized to the project site for the successful installation of the three casings under highway 63, while minimizing construction delays and negotiating with sub-contractors to stay within project budget.
Gemini Engineered Solutions LP / Plains Midstream Canada NPS 20 Kerrobert Tank Farm to Rail Terminal
Paladin was retained under Gemini to provide construction management services for the construction of 5 km NPS 20 pipeline to the new rail terminal in Kerrobert Saskatchewan. Paladin provided a team of experts in the field while providing in-house technical support from home office. Paladin’s construction management team worked directly with Gemini's and Plains Midstream's Construction Management teams on the successful completion of the project while managing to save construction costs and schedule overruns due to maximizing efficiency in the field.
Recent Comments by gergana
No comments by gergana yet.